Tender Advertisement #1557793
Barge ramp upgrade
Location

Closing

Tender Details
TC25072. Dauan Barge Ramp Upgrade.
The works include, but are not limited to, undertake works on Dauan Island to remediate the damaged barge ramp. The remedial works involve the removal and replacement of damaged sections of barge ramp as to the supplied Royal Haskoning designs Detail Plan - Option B in conjunction with the MAL Engineering drawings.
The Scope of WUC includes, but is not limited to:
• Site establishment and disestablishment
• Establishment of Contractors Site Facilities,
• Documentation, project management and compliance with all regulations,
• Stakeholder Consultations in conjunction with TSIRC for temporary closure of barge ramp,
• Provisions for barge ramp operations (If ordered),
• Geotechnical Investigations,
• Survey,
• Quality Assurance and Quality Control,
• Environmental Management,
• Demolition of existing Structures,
• Excavation of materials,
• Concrete Works in a tidal area,
• Precast Panel casting / supply / install,
• Installation of rock revetment, and
• Any other item included in the contract documents and not detailed above. Work by the Principal or others (including Principal Supplied Materials)
• The Principal will not provide any material, plant, labour and/or any other service required for WUC.
The works include, but are not limited to, undertake works on Dauan Island to remediate the damaged barge ramp. The remedial works involve the removal and replacement of damaged sections of barge ramp as to the supplied Royal Haskoning designs Detail Plan - Option B in conjunction with the MAL Engineering drawings.
The Scope of WUC includes, but is not limited to:
• Site establishment and disestablishment
• Establishment of Contractors Site Facilities,
• Documentation, project management and compliance with all regulations,
• Stakeholder Consultations in conjunction with TSIRC for temporary closure of barge ramp,
• Provisions for barge ramp operations (If ordered),
• Geotechnical Investigations,
• Survey,
• Quality Assurance and Quality Control,
• Environmental Management,
• Demolition of existing Structures,
• Excavation of materials,
• Concrete Works in a tidal area,
• Precast Panel casting / supply / install,
• Installation of rock revetment, and
• Any other item included in the contract documents and not detailed above. Work by the Principal or others (including Principal Supplied Materials)
• The Principal will not provide any material, plant, labour and/or any other service required for WUC.
This information is not guaranteed to be accurate or complete. Please confirm all details with the Tendering Firm before responding.